YZY Construction

Scandinavian eco-friendly backyard cabins and granny flats made of mass timber. Our buildings are mostly used as a secondary dwelling or an extra room to accommodate guests, rent out as a B&B, for Art/Painting Studio, a She shed, holiday property accommodation, Mans cave, Pool house, Music studio, Home Office, Teenage or Parents retreat or a multipurpose room.

PRICING TO ERECT YZY CABINS

1 Room & Studios

Crete Panorama 10 m2

$9,400 ex GST

$10,340 inc GST
  • Included Deck Area: 4 m2

Milos 14 m2

$11,050 ex GST

$12,155 inc GST
  • Included Deck Area: 4 m2

Corsica Panorama 18 m2

$13,125 ex GST

$14,438 inc GST
  • Included Deck Area: 6 m2

Skyros 19 m2

$13,125 ex GST

$14,438 inc GST
  • Included Deck Area: 6 m2

Sicilia Panorama 20 m2

$13,985 ex GST

$15,384 inc GST
  • Included Deck Area: 6 m2

1 Bedroom

Sicilia Panorama 30 m2

$17,120 ex GST

$18,832 inc GST
  • Included Deck Area: 8 m2

Corsica 30 m2

$17,120 ex GST

$18,832 inc GST
  • Included Deck Area: 8 m2

2 Bedroom

Malta 49 m2

$26,225 ex GST

$28,848 inc GST
  • Included Deck Area: 8 m2

Inclusions

1.    Construction on a level site, free from vegetation.

2.    Allows for Surefoot foundations.

3.    Construction of Subfloor, Structural Flooring & Flashing, Walls, Windows, Doors, Tiedown, Roofing.  

4.    Guttering & Downpipes to Ground Level only.  Connection to discharge point by others.

5.    Decking areas up to those listed above with one steel stringer stair up to 3 trends in height.

6.    Installation of internal timber floating floor – interlocking planks.

7.    QBCC insurance.

8.    Assumes good site access for delivery & materials delivered near build location.

9.    Construction as 45mm wall thickness.  80mm wall thickness adds 6% to above pricing.

10.  Waste removal.

 

Exclusions

1.    Building setting out (The BA often requires a form 12 from a licenced surveyor).

2.    Site soil test and Site contour plan, Council Fees / Private certification.

3.    Installation of handrails.

4.    All earthworks including demolition.

5.    Plumbing, electrical, kitchens, bathrooms, tiling (incl waterproofing), painting and landscaping.

6.    Any accommodations & travel costs.

7.    Site facilities.

8.    We can complete all other items using our network of trades at the following rates: 

       Project Management time to organise & BBA labour as required.

       Subcontractors & Materials:  Cost plus 14%.

       BBA labour rates (excluding GST):

      Project Management = $85 per hour.

      Two-man team = $140 per hour.